The initial contract was for mains distribution installation, and design & build for non-production areas. Following this phase, we fitted out the entire factory, including supplies and complex control wiring for automated production lines.
This large project requiried full spectrum electrical skills, from heavy distribution (600A supplies) to technical control wiring.
Other systems included street lighting, air-sampling fire detection an access control system and a data network.