A successful complex digital project onsite

Project Overview

Rathbone Square was Great Portland Estate’s largest single development to date. It was also central London’s first new large public square in a century. The programme demanded exceptional perfomance and utilised digital technologies widely onsite during design and installation. TClarke were selected to play a major role with main contractor Lendlease in bringing the project to a successful conclusion.

Quote

“Over 3 years, with our partners, we've delivered Rathbone Square as an effective digital project from start to finish.”

Barrie Nightingale, Director, TClarke London

Key facts

Highlights from our work on Rathbone Square

Design & Installation Level 2 BIM fully utilised by site teams
Fire & Alarm Integration into BMS
Project £16.75m value
Average 70 workforce
Office Space 242,000 square feet
Programme 40 months duration

Professional Team

  • Architect – Make Project Manager – Buro 4
  • Structural Engineer – AKT II
  • Building Services Engineer – Hilson Moran
  • Fire Engineer Consultant – Jeremy Gardner Associates
  • Specialist Lighting Designer – Speirs & Major

Scope of Works

  • 1x HV Switch Panel
  • 2x TX’s
  • 2 LV Substations
  • 15 LV Switch Panels
  • 5 Rising Busbars
  • 94 Distribution Boards
  • 162 Consumer units
  • 43 ATS’s
  • 38km of Submain Cabling
  • 1x 800kVA Life Safety Generator
  • 1x 60kVA UPS
  • 1x 30kVA UPS
  • 1x 60.5KW PV Array
  • 1x 22.5KW PV Array
  • Addressable Fire Alarm System with Graphics package
  • Public Address Voice Alarm System
  • Disabled Refuge and Toilet Alarm System
  • SCADA EMS System
  • EEMS System c/o 600+ Electrical and Mechanical Meters
  • Major Leak Detection System
  • Shell and Core to 3 Basements, 7 commercial floors and 9 Residential floors
  • General Lighting and Power throughout
  • Specialist lighting to two courtyards and 5 Terraces
  • 2 Separate Full DALI Lighting Control Systems
  • 1x Standalone Lighting Control System
  • Access Control and security cameras throughout
  • Structured Cabling throughout
  • Lighting Control and AV in 142 apartments
  • Self-Contained Emergency lighting System and 2 Central Batteries for same

Specialist Areas

  • Underground Automatic Car Stacking system for 79 cars
  • Large public Square with specialist lighting
  • Gymnasium
  • Swimming Pool
  • Sauna/Steam Rooms
  • Media Room
  • Wine Store
  • Library
  • 5 Large external Terraces
  • Private Residential Courtyard with Specialist Lighting

Hear how we delivered this as a digital project

Many of our clients now need to deliver digital projects. TClarke is ready and capable to play a full role. This film shows the experience we have at every level and stage of the process.

100 Bishopsgate : new City tower

950,000 sq ft of premium office space in the heart of London

Read more

Bank Station : high-profile infrastructure

Our Infrastructure team innovates to add direct value for commuters

Read more

Bloomberg Place : UK’s best new building 2018

‘This building has not just raised the bar…it has smashed the ceiling’ This is the RIBA 2018 Stirling prize winner

Read more