10389Tempo Maidenhead is another major regional project win

Tempo Maidenhead is another major regional project win

9/11/22: TClarke has won the full MEP installation contract for the environmentally outstanding, 150,000 sq ft Tempo Maidenhead office development and work is starting imminently.

Group CEO Mark Lawrence commented: “This is an excellent, large scale engineering services project, won by our UK South team, operating from our Peterborough office. It is another demonstration of our ability to deliver the kind of growth we set out to achieve in our strategy by winning major regional projects.”

Tempo Maidenhead targets very high sustainability standards including a BREEAM ‘exceptional’ rating. To get there, The building will use no natural gas for heating and instead rely upon electrically driven air source heat pumps.Tempo’s design is optimised to include 237 PV panels (totalling over 5,500 sq ft) which is combined with enhanced fabric performance to reduce energy use by over 23% when compared to “business as usual” energy performance targets set out by both LETI and RIBA. Tempo benefits from new, efficient glazing and the existing stonework to the facade will be sensitively retained in order to reduce the embodied carbon of the refurbishment.

TClarke’s package includes LV distribution, CAT A fit out, including lighting, fire alarm, small power, CCTV, access controls, heat pumps, fan coil units, domestic water services and ventilation. This is another project nationwide in which TClarke are partnering principal contractor ISG.